• Project Name: ๐—จ๐—ป๐—ถ๐˜๐—ฒ๐—ฑ ๐—ฃ๐—ฒ๐˜๐—ฟ๐—ผ๐—น๐—ฒ๐˜‚๐—บ ๐—™๐˜‚๐—ฒ๐—น ๐——๐—ฒ๐—ฝ๐—ผ๐˜ ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป: ๐— ๐—ฎ๐—ป๐—ด๐—ฎ๐—ฝ๐˜„๐—ฎ๐—ป๐—ถ, ๐—ญ๐—ฎ๐—ป๐˜‡๐—ถ๐—ฏ๐—ฎ๐—ฟ.

At Job-Plan (T) Ltd., we deliver engineering and construction solutions that combine innovation, reliability, and long-term performance. Our work in Mangapwani, Zanzibar for the United Petroleum Group a subsidiary of the Bakhresa Group stands as a testament to this commitment.

Phase 1 of the project, completed in 2022, has operated smoothly for more than two years, reinforcing the trust and confidence of our client. Building on this success, we commenced Phase 2, the depot extension, in October 2025, further advancing our contribution to the regionโ€™s fuel infrastructure development.

๐—ฃ๐—ฟ๐—ผ๐—ท๐—ฒ๐—ฐ๐˜ ๐—›๐—ถ๐—ด๐—ต๐—น๐—ถ๐—ด๐—ต๐˜๐˜€:


Scope of Work included:


– Design and construction of main office block, warehouse, firefighting house.


– Fabrication and installation of bulk storage fuel tanks, 24,000 mยณ in total capacity


– Installation of a 12โ€ offloading submarine pipeline, metering system, loading gantry, firefighting system, and internal fuel distribution system

The Phase 2 extension focuses on a substantial capacity upgrade designed to strengthen the depotโ€™s operational efficiency and storage resilience.ย 

This phase involves a 28,000 mยณ expansion, achieved through the construction of three new storage tanksโ€”two with a capacity of 10,000 mยณ each and one with 8,000 mยณ.

These additions are engineered to meet modern safety, operational, and industry performance standards, ensuring the facility can reliably support increasing fuel demand while maintaining optimized flow, handling, and storage integrity.

Our commitment is clear: “We do not settle for what just works but strive for what works best.